Stamford Fuel Tank Replacement

Construction of a new fleet fueling facility for the City of Stamford Connecticut. A 4 lane fueling facility will be fully operational before the existing fueling facility is demolished. The new fuel facility will include a canopy with a fire suppression system and 3 underground storage tanks. A fuel management system will be installed. All 750 city vehicles will have modules installed at the fuel tank filler neck. The fuel will not dispense into a vehicle unless it recognizes the module. This project is scheduled for completion in November of 2013.